Situation in most affected areas as of 28 May: * Emergency situation remains in 2 cities and 14 municipalities. * Stagnation is expected on the Rivers Danube and Saya. * Floods compromised critical Infra structure including industrial sites near river and excavation mines. * Great number of landslides and mudslides affecting critical infra structure, threat of further landslides. * Many road closures. * Agricultural losses in flooded area widespread. * Minor risk of landmine displacement. International response as of 28 May: * High capacity pumping operations continue to be concentrated in Belgrade-Obrenovac but are hampered by dam breaches. * Further pumping operations in several locations ongoing although now reducing in number. * High capacity water purification facilities being deployed. * Biological decontamination is ongoing. * Landslides and risk of further landslides being assessed. * Logistics capacity being assessed.